Skip to main content Skip to complementary content

Dropping and linking the components

Procedure

  1. Drag and drop the following components from the Palette to the workspace: tFixedFlowInput (X2), tHashOutput (X2), tHashInput and tFileOutputDelimited.
  2. Connect the first tFixedFlowInput to the first tHashOutput using a Row > Main link.
  3. Connect the second tFixedFlowInput to the second tHashOutput using a Row > Main link.
  4. Connect the first subJob (from tFixedFlowInput_1) to the second subJob (to tFixedFlowInput_2) using an OnSubjobOk link.
  5. Connect tHashInput to tFileOutputDelimited using a Row > Main link.
  6. Connect the second subJob to the last subJob using an OnSubjobOk link.

Did this page help you?

If you find any issues with this page or its content – a typo, a missing step, or a technical error – please let us know!