Skip to main content Skip to complementary content

Configuring a Weekly trigger for Job tasks

Use a Weekly trigger to execute your task on a regular basis over a period of time.

Before you begin

You must have the Execute permission on the workspace where the task is located to configure the Schedule steps when creating or editing a task.

About this task

You should adapt the schedule settings depending on the number of weeks in a year and the start date.

How do you know if a year has 52 or 53 weeks?

Most years have 52 weeks. There are 53 weeks in a year if the last week of the year is the 53rd and has at least 4 days in the current year. For example:
  • 2024 has Monday to Tuesday on the 53rd week and Wednesday to Sunday on 2025. Only 2 days are in the 53rd week of the year. 2024 has 52 weeks in the year.
  • 2026 has Monday to Thursday on the 53rd week and Friday to Sunday on 2027. 4 days are in the 53rd week of the year. 2026 has 53 weeks in the year.

You can use this endpoint to simulate the next runs.

You can edit the start date of the weekly trigger or use a CRON trigger if you want to change and adapt your schedule for the end of the year or the new year.

Procedure

  1. If you are editing your task after it has been created, go to its details page, then click the Edit trigger icon next to Trigger.
  2. Click the Add trigger icon.
  3. Enter the name of the trigger.
    The name must contain only alphanumeric, -, # and _ characters. Spaces and other special characters are not allowed.
  4. Select Weekly from the Trigger type drop-down list.
  5. In the Location (time zone) field, define the time zone for your executions.
  6. Enter the start date of the run.
  7. Specify values for the following fields:
    The following table presents the options used to define a weekly trigger
    Field Description
    Repeat every X week(s) Define the frequency of the run in weeks.
    On Select one or more days from the drop-down list.
    Repeat Select one of the following options:
    • At specific time(s): to run the task at specific times during the week.

      From the Trigger time field, select the execution time.

    • At specific intervals: to run the task at specific intervals during the week.
      • In Repeat every X minutes, set the interval time in minutes.

      • In the Repeat from field, enter the start time for the run.

      • In the Repeat until field, enter the end time for the run.
    In this example, the run will happen every four weeks on Tuesday and Thursday at 5 PM.
    Page to define weekly trigger at specific times.
    In this example, the run will happen every two weeks on Monday and Friday every hour from 10 AM to 4 PM.
    Page to define weekly trigger at specific intervals.
  8. Optional: Set the trigger timeout by selecting Same as task, No timeout or Custom.
    By default, the trigger timeout value is the same as the task timeout.
    Trigger timeout overrides task timeout.
  9. Click Save and close.

Results

A confirmation message is displayed at the top of the page. You are redirected to the task details page. The schedule you have defined appears under Trigger > Trigger type > Weekly.

You can also view the schedule in the Tasks tab. Click the Triggers and plans icon.

Troubleshooting:

If you have selected a time zone with Daylight saving time (DST) changes for your schedule, the transition of Daylight saving time affects the execution schedule since a time interval is repeated due to this transition, and thus the next actual execution is adjusted accordingly. For further information, see Schedules with DST.

Did this page help you?

If you find any issues with this page or its content – a typo, a missing step, or a technical error – please let us know!