Skip to main content Skip to complementary content

Dropping and linking the components

Procedure

  1. Create a new Job and add the following components by typing their names in the design workspace or dropping them from the Palette: a tFixedFlowInput component, a tOracleOutput component, a tOracleCDC component, a tOracleCDCOutput component, two tOracleInput components, and two tLogRow components.
  2. Connect tFixedFlowInput to tOracleOutput using a Row > Main link.
  3. Do the same to connect tOracleCDC to tOracleCDCOutput, the first tOracleInput to the first tLogRow, and the second tOracleInput to the second tLogRow.
  4. Connect tFixedFlowInput to tOracleCDC using a Trigger > On Subjob Ok connection.
  5. Do the same to connect tOracleCDC to the first tOracleInput and the first tOracleInput to the second tOracleInput.

Did this page help you?

If you find any issues with this page or its content – a typo, a missing step, or a technical error – please let us know!