Unlinking from a master dimension
If you want to make changes to a dimension that is linked to a master dimension, you must first unlink it from the master dimension. The dimension in your visualization is then independent with no connection to the master dimension in the assets panel.
Unlinking from the properties panel
A linked dimension that is used in a visualization can be unlinked from the properties panel.
Do the following:
-
Click @ Edit.
The properties panel opens on the right-hand side.
-
Select the visualization on the sheet.
The properties for the selected visualization are displayed in the properties panel.
-
Under Data, locate and click the dimension.
A linked dimension is indicated by the symbol é.
-
Click é.
A dialog is displayed that you are about to unlink from a master dimension.
-
Click OK.
The dimension used in the visualization can now be edited and the changes will not affect any other dimensions.
Did this page help you?
If you find any issues with this page or its content – a typo, a missing step, or a technical error – let us know how we can improve!