User directory connectors associated items
The following table presents the available fields for the associated items. By default, only some of the fields are displayed. You can use the column selector (
) to add fields.Tip noteYou can adjust the column width by dragging the header border.
Tasks
Tasks is available from Associated items when you edit a used directory connector. The overview contains a list of tasks associated with the selected used directory connector.
Property | Description |
---|---|
Name | The name of the task. |
Type | The type of task (user synchronization or reload). |
UDC name | The user directory connector that the task is associated with. |
Enabled |
Status values: Yes or No. |
Status | The status of the task. |
Tags | The tags associated with the task. |
ID | The ID of the task. |
Created | Date and time when the task was created. |
Last modified | Date and time when the task was last modified. |
Modified by | By whom the task was modified. |
Custom properties |
Custom properties, if any, are listed here. |
Did this page help you?
If you find any issues with this page or its content – a typo, a missing step, or a technical error – let us know how we can improve!