跳到主要内容

XMIT 文件“接收”作业示例

以下是接收 LOAD 和 INSTALL 库的示例作业。

//*******************************************************************
//*                     Sample JCL for receiving                    *
//* IBM DB2 for z/OS connector installation kit   *
//* 1. Add a jobcard                                                *
//* 2. Replace all <xmit-HLQ> with the High Level Qualifier used      *
//*    for receive files                                            *
//* 3. Replace all <r4z-vn-hlq> with the High Level Qualifier chosen  *
//*    for the installation files                                   *
//*******************************************************************
//RCVLOAD  EXEC PGM=IKJEFT01,DYNAMNBR=20
//SYSPRINT DD SYSOUT=*
//SYSTSPRT DD SYSOUT=*
//SYSTSIN DD *
RECEIVE INDSN('<xmit-HLQ>.LOAD.XMIT') NODISPLAY
DATASET('<r4z-vn-hlq>.LOAD')
/*
//RCVINSTL EXEC PGM=IKJEFT01,DYNAMNBR=20
//SYSPRINT DD SYSOUT=*
//SYSTSPRT DD SYSOUT=*
//SYSTSIN DD *
RECEIVE INDSN('<xmit-HLQ>.INSTALL.XMIT') NODISPLAY
DATASET('<r4z-vnd-hlq>.INSTALL')
/*

本页面有帮助吗?

如果您发现此页面或其内容有任何问题 – 打字错误、遗漏步骤或技术错误 – 请告诉我们如何改进!