# Configuring your Talend Big Data product

This chapter provides basic information required to configure and set up your Talend Big Data.

### In this section

* [Starting and configuring the Talend Administration Center](https://help.qlik.com/talend/en-US/studio-getting-started-guide-big-data/8.0/starting-and-configuring-talend-administration-center)
* [Launching Talend Studio for the first time](https://help.qlik.com/talend/en-US/studio-getting-started-guide-big-data/8.0/launching-studio-for-first-time)
* [Logging on to Talend Studio](https://help.qlik.com/talend/en-US/studio-getting-started-guide-big-data/8.0/logging-on-to-studio)
* [Setting up the connection to your Big Data platform](https://help.qlik.com/talend/en-US/studio-getting-started-guide-big-data/8.0/setting-up-connection-to-your-big-data-platform)
* [Uploading files to DBFS (Databricks File System)](https://help.qlik.com/talend/en-US/studio-getting-started-guide-big-data/8.0/uploading-files-to-dbfs-databricks-file-system)
* [Preparing the movies metadata](https://help.qlik.com/talend/en-US/studio-getting-started-guide-big-data/8.0/preparing-movies-metadata)